
Material Lift Systems
Heavy-duty freight elevators designed for maximum vertical efficiency during intensive construction finishing periods. Engineered for reliability, safety, and rapid deployment.
Technical Specifications
Erection Service
Professional deployment and rigging by our senior engineering crew.
Wall Tie-In
Precision structural anchoring for maximum stability at peak heights.
Dismantling
Safe and systematic decommissioning post-project completion.
Configurations

Single Configuration
Compact footprint for narrow shafts and lighter load profiles.

Double Configuration
Doubled throughput for high-demand finishing-phase logistics.
Description
Given the material needs of freight elevators in the building during the finishing period, this tool can overcome them. It requires an operator to run it, and rental costs can be reduced by using this equipment.
Available in single and double configurations. Peter-Lister 3-cyl. industrial-grade engine, 800 kg capacity, 40-meter maximum height.